How to Make Chamfer Edge in Concrete

A chamfer edge on a solid is an inclined or calculated corner showed up, wellbeing and simple expulsion of formwork of cement. The arrangement of a sharp pleasant corner is for all intents and purposes troublesome and the solid at corners is effectively chipped, thusly the arrangement of chamfer edge could shield the corner from chipping.

Step by step instructions to Make Chamfer Edge in Concrete 

By and by there are generally 2 kind of strategies utilized really taking shape of chamfered edge concrete,

1. By utilizing Chamfer Strips 

This technique for chamfering of solid edges is done before the laying of cement. The formwork work for the laying of cement is fixed with the chamfer strip at the edge. Contingent upon the prerequisite of chamfered edge size, chamfer strips are accessible in the extents of 1/2, 3/4 and 1 inches. It is made of either elastic or wood.



These chamfered strips are introduced and cement is laid through ordinary techniques. Compaction of cement must be guaranteed for smooth and even finish. After 24 hrs, formwork is expelled gradually. No further mediations of completing are required in this technique.

2. By utilizing Chamfer Edging Tools 

In this strategy, chamfer edging devices are utilized for making chamfered edges. In contrast to the above technique, this is done after the solid has been set and the surface water has dried off(20 to 30 mins subsequent to setting of ordinary cement). With the assistance of chamfer devices, the edges of the solid are striked off.

Contingent upon the sort of chamfered apparatus utilized, same kind of chamfer structure and size is gotten on the solid edge. It requires gifted work to make this as even and smooth edge.

System of Making of Chamfer Edge 


  1.  Enable the solid to fix until any water superficially disperses. Normally, this takes around 20 to 30 minutes after the solid is poured and troweled with a wooden buoy. 
  2.  Start by chamfering the edges of the yard with the edging apparatus to insert any rock underneath the completed surface. Hold the handle of the instrument and supplement the lower edge into the crease between the edge of the solid and the structure. Utilize the inward essence of the structure as a guide and work the device forward and in reverse, utilizing long strokes. 
  3. Rehash the above advance utilizing the edging instrument. This time, utilize light weight on the apparatus and make a uniform, chamfered edge. Enable the solid to remedy for two hours or until a light swipe with the steel trowel doesn't influence the surface's completion. 
  4. Haul the nails out of the structure stakes, utilizing the hook end of a mallet. Draw up the stakes. Tap one finish of the structure a few times with the sledge to discharge it from the edge of the solid patio. Slide the structure one way and lift it up simultaneously to expel it without harming the face or edge of the yard. 
  5.  Put crisp water in a 5-gallon can. Plunge an elastic buoy utilized for completing mortar into the water. Utilize little, range strokes with the buoy to complete the essence of the patio where the structure was evacuated. Start each stroke at the upper, chamfered edge and work descending. Plunge the buoy into the water every now and again for the best outcomes.
Previous Post
Next Post

post written by: